Hydrology Section 2, Phrae, Office of Water Resources Region 9.
On February 4-5, 2026, Mr. Nimit Kotbua, Director of the Regional Water Resources Office 9, assigned the Hydrology Division 2, Phrae, to conduct a field inspection and maintenance of the water level monitoring system in small reservoirs in the districts of Song, Sueng Men, Wang Chin, and Long, Phrae Province. A total of 5 reservoirs (10 stations) were inspected. The field staff and civilian volunteers were reviewed to ensure accurate reporting of field data into the system. This provides a true picture of water levels in the area, enabling appropriate water management during both flood and drought conditions.
